| Re-Roofed B.914 (1480 F Street) at a cost of $4,207. |
| Re-Roofed B.1202 (975 E Street) at a cost of $8,991. |
| Re-Roofed Maintenance Buildings at a cost of $32,640. |
| Re-Roofed B.805 (720 C Street) at a cost of $11,000. |
| Maintenance crew crack-sealed Taxiways B, C, D, E and Industrial Park roads at a cost of $24,000. |
| Entered into contract with Walla Walla County Public Works to chip-seal Lear, B and G Streets at a cost of $52,000. |
| Entered into a 5-year farm lease for farm north of airport with Jason Beechinor. Banked a portion of the water rights with Walla Walla Watershed Management Partnership. |
| Entered into a 5-year terminal restaurant lease with Dominick's on the Runway. |
| Trio Winery graduated out of the wine incubator program and moves downtown. |
| Entered into a new wine incubator lease with Corvus Cellars, Inc. |
| Extended lease agreement with the Corps of Engineers Logistics for building (725 E Street) for an additional 5-years. Airport to receive $256,659 in revenue during the renewal term. |
| Leased additional 2nd floor terminal office space to Pocketinet Communications. Airport to receive $1,838 in additional monthly income. |
| Extended lease agreement with Blue Ridge Aircraft Services for hangar (199 W. Fairchild) for an additional 5-years. |
| Extended lease agreement with Blaze King Industries for an additional 5-years with one 5-year option. Airport and Blaze King split improvement costs for a new loading dock and grading/asphalt work of parking lot. Airport to receive rental income of $302,040 over a 5-year period. |
| Reiff Manufacturing suffered a fire on April 12. Port agrees to use insurance proceeds and airport funds to construct a new 7,000 s.f. manufacturing building at a cost of $519,300. |
| Airport entered into agreement with Nelson Irrigation and Tamarack Cellars to make B.120 (102 W. Aeronca) drainage and concrete slab improvements at a cost of $18,500. |
| Refurbished the remaining airport terminal building directional signs at a cost of $4,000. |
| Purchased a manlift for the maintenance department at a cost of $21,660. |
| Seeded the safety areas on Rwy 7/25 and Twy C at an approximate cost of $12,000. |
| Installed an automatic, door lock/unlock system with web cameras in the terminal building at a cost of $9,100. |
| Completed a Sewer Replacement Master Plan for the airport industrial park at a cost of $4,500. |
| Repaired Hangar 118 roof at a cost of $9,500. |
| Airport develops a comprehensive "Aviation Fueling Policy". |
| Installed flat-screen television and coffee/tea beverage service in the terminal screening room at a cost of $2,600. |
| City of Walla Walla, through IPZ partnership with airport, installs fiber optics in the industrial park. |
| Airport successfully passes its annual FAA Part 139 inspection. |
| Airport held Pilot Form for aviation users. |